STAAD Foundation Advanced Help

Designing a Pile Cap

Do either of the following:

Select Pile Cap Job > Design.

or

Click the Design / Analysis tool in the Standard toolbar.

The Design Progress Report is displayed in the Output pane. When the design is complete, a summary of the design is displayed on the Pile Cap Design Summary tab in the Output pane and the Calculation Sheet is opened to review the design calculations.

Note: The Y Loading Position must correspond to the elevation of the foundation supports.